Wednesday, March 23, 2011

The Bathroom Remodeling Projects

We decided to replace our shower and bathroom floors with travertine stone tiles.  It has taken a few weeks to get the master bath done but it has been worth it.  I tore out the old shower and floors and rebuild the shower.






The shower was enclosed on all four sides except for a small door.  I took out the wall where the door was so the shower ended up U shaped.  It looks great.  Our neighbor Howdy Whipple installed the stone for the shower and the floor in that bathroom.

  
Following his example I just replaced the old floor in the main bathroom with the travertine stone tile. 
Now I have to replace the baseboard and touch up some of the paint.  Then on the the entry way floor.  Hopefully I can get that done in the next few weeks.